Mold Remediation.
MOLD REMEDIATION ESTIMATES
We write your Mold Remediation Xactimate estimate for you — submit your claim details, get a carrier-ready file in 24–48 hrs.
Every order includes an editable .esx file and a PDF.
EST. DELIVERY
24–48 hrs
PRICE CALCULATOR · NO LOGIN
CLAIM VALUE BAND
Claims over $500,000 — contact us for a custom quote
Select a claim value band to see your price.
Every order includes an editable .esx file and a PDF.
Start Your EstimateMold scopes get cut when containment and HEPA aren't documented to protocol. We build containment, negative pressure, HEPA, and removal line items that follow the IICRC S520 framework — with a PRV placeholder so the clearance step is priced in.
WHO IT'S FOR
- Remediation contractors billing containment + HEPA
- Adjusters needing protocol-based scopes
- Public adjusters on disputed mold claims
AT A GLANCE
- Turnaround
- 24–48 hrs
- Protocol
- IICRC S520
- PRV
- Placeholder included
01
Upload affected-area info
Square footage, visible mold locations, moisture source, and photos of affected + hidden areas.
02
We scope to protocol
Containment, negative pressure, HEPA, biocide, and removal line items built to the S520 framework.
03
Delivered with PRV
.esx + .pdf including a post-remediation verification placeholder for the third-party IH.
IN THE SCOPE
- Containment + negative-pressure line items
- HEPA vacuuming / biocide / encapsulation scope
- Affected-material removal line items
- Post-remediation verification placeholder
DELIVERED
- Xactimate .esx remediation scope
- Containment + negative-pressure line items
- HEPA / biocide / encapsulation line items
- PRV placeholder for clearance testing
Our rate goes down as your claim goes up. Every price is published — you pay once, at checkout. No deposits, no invoices, no calls.
RUSH +25% · SAME BANDS ACROSS EVERY VERTICAL · OVER $500K CUSTOM QUOTE
Crawlspace mold on joists from a slow leak
Bathroom wall — contained remediation
Adjuster denied HEPA days as 'excessive'
Have these ready before you start. The more complete the intake, the tighter the scope.
Do you include the post-remediation verification (PRV)?
We include the PRV placeholder and line items; the actual clearance testing must come from a third-party IH.
Do you follow IICRC S520?
Yes — containment, negative pressure, and HEPA line items are built to the S520 remediation framework.
What if the moisture source isn't fixed yet?
We can still scope the remediation; flag the source as unresolved on intake and we note it as a precondition in the file.
START YOUR MOLD REMEDIATION