Water Damage & Mitigation.
WATER DAMAGE & MITIGATION ESTIMATES
We write your Water Damage & Mitigation Xactimate estimate for you — submit your claim details, get a carrier-ready file in 24–48 hrs.
Every order includes an editable .esx file and a PDF.
EST. DELIVERY
24–48 hrs
PRICE CALCULATOR · NO LOGIN
CLAIM VALUE BAND
Claims over $500,000 — contact us for a custom quote
Select a claim value band to see your price.
Every order includes an editable .esx file and a PDF.
Start Your EstimateMitigation estimates live or die on documentation. We translate your moisture readings, drying timeline, and affected-material scope into a defensible Xactimate file that holds up to adjuster scrutiny — category, class, equipment usage, and demo all line-itemed.
WHO IT'S FOR
- Restoration contractors billing mitigation that adjusters cut
- Public adjusters documenting category 2/3 losses
- Contractors who need a defensible drying timeline
AT A GLANCE
- Turnaround
- 24–48 hrs
- Format
- .esx + .pdf
- Line items
- Unlimited
01
Upload readings + photos
Per-material moisture percentages, room dimensions, and loss photos — no login, no discovery call.
02
We build the scope
Room-by-room Xactimate line items with category/Class, demo, and equipment days applied to your drying timeline.
03
Review & submit
Delivered as .esx + .pdf, ready to attach to your claim and stand up to adjuster review.
IN THE SCOPE
- Xactimate estimate with line-item moisture readings
- Category (1/2/3) and Class (1–4) documentation
- Affected-room-by-room scope with dimensions
- Demolition + equipment usage timelines
DELIVERED
- Xactimate .esx file (importable)
- PDF estimate summary
- Category & Class documentation block
- Equipment usage timeline by day
Our rate goes down as your claim goes up. Every price is published — you pay once, at checkout. No deposits, no invoices, no calls.
RUSH +25% · SAME BANDS ACROSS EVERY VERTICAL · OVER $500K CUSTOM QUOTE
Adjuster cut your drying days or equipment count
Cat 2 / Cat 3 gray-water loss needing full documentation
Multi-room loss with mixed affected materials
Have these ready before you start. The more complete the intake, the tighter the scope.
Do you need drying logs to write a mitigation estimate?
Helpful but not required. If you upload moisture readings and a timeline we build the drying-equipment usage straight into the scope.
What if the adjuster already cut my drying days?
Order a Supplement, upload the adjuster's estimate, and we re-scope against it with a defensible day-count and equipment justification.
Can you handle Cat 3 / black-water gross contamination?
Yes. We document the category, PPE level, and disposal line items so the scope reflects the actual contamination, not a Cat 1 baseline.
START YOUR WATER DAMAGE & MITIGATION